Home Trail Work Black Mountain Trail Work - February 21, 2009

We meet every third Wednesday of the month @  7 pm  at Mission Trails Regional Park Visitor Center.

Check the Event Calendar for the next meeting.

SDMBA Events Calendar

October 2014
M T W T F S S
29 30 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 31 1 2

Afflilates

Black Mountain Trail Work - February 21, 2009 PDF Print E-mail

On Saturday, February 21, eighteen SDMBA volunteers opened a new stretch of single-track at Black Mountain Open Space Park. The new connector links Miner’s Ridge Loop Trail to the north with the Nighthawk trail system to the south. Although the trail technically existed before this volunteer event, its sightlines, signage, and tread were inadequate for mountain biking.

The new connector trail has been a long time in coming. Aerial photos showed the trail existed when the arsenic mine was active. After the mine closed, the mountain reclaimed the trail. In 2002, Ranger John Barone and I discussed cutting a new trail near the site of the old trail. After John left Black Mountain Park, Ranger Tom Miller (with support from city trail manager Rick Thompson) continued to push for the construction of the new trail. Tom managed to bypass some of the bureaucracy of building a new trail by showing that the old trail had once existed and aligning the new connector over the old one. In 2007, Tom led a group that re-cut the connector, but final approval to complete construction (widen, mark, build the puncheon bridge, etc.) and officially open it didn’t come until earlier this year. Our group of 18 volunteers completed that construction.

For the seventh year in a row, Black Mountain Bicycles donated swag – including a rear derailleur and hydration pack – to raffle off to volunteers after trail work concluded around 12:30pm. Everyone went home with something.

Thanks go to all of our volunteers for helping to open yet another trail in Black Mountain Park (our second in the past 3 years) – now go ride it! (A map to the new Connector Trail can be found on the second page of the event announcement.) Special thanks to Rich, Gardner, Everett, Michael, John, Kim, Tom, and Evan for being trail bosses and Sr. Ranger Ed Christensen for providing tools, logistics, materials, and support.

Volunteers with swag donated by Black Mountain Bicycles

Volunteers with swag donated by Black Mountain Bicycles

Taking a break on the new connector trail

Evan and his crew taking a quick break

Sr. Ranger Ed Christensen places a sign

Sr. Ranger Ed Christensen installing a trail marker

Everett doing some tread improvement

Everett doing some tread improvement

Black Mtn Park Liaison Dave Wenk

New connector trail crosses a scenic section of the mountain

Yanking stumps out of the trail tread

Stump and brush removal

Clearing brush at Black Mountain Park

John cuts back some brush

Improving sight lines at Black Mountain Park

Improving sight lines

A nearly complete section of the Connector Trail

A nearly complete section of the new Connector Trail

A puncheon bridge at Black Mountain Park

A newly constructed puncheon bridge

 

Copyright © 2014 SDMBA - San Diego Mountain Biking Association. All Rights Reserved.
Joomla! is Free Software released under the GNU/GPL License.